+86-592-5759276
enLanguage
Tank Cleaning Full Cone Nozzle video

Tank Cleaning Full Cone Nozzle

Spray patterns: Full Cone
Spray angles: 80° and 120°
Flow rates: 0.424 to 8.39 l/min

Description

Tank cleaning full cone nozzle

Tank cleaning full cone nozzle

Tank cleaning full cone nozzle

Standard Materials: Brass, 303 Stainless Steel, and 316 Stainless Steel.


Tank cleaning full cone nozzle

DESIGN FEATURES

• Standard 3-piece construction

• Male and female connections

• Interchangeable spray tips


Tank cleaning full cone nozzle

SPRAY CHARACTERISTICS

Spray patterns: Full Cone

Spray angles: 80° and 120°

Flow rates: 0.424 to 8.39 l/min


Tank cleaning full cone nozzle


Why Choose US?

1.since we hancle all stepsin one location,our processis speedy,cost efficient andwell controlled.Equip ourfactory with 30set CNC,15set CNC turning and 10setSheet Metal Fabricationmachine to assure thecustomers high qualitymetal machining parts.

2.we focus on CNC machining since 2007,withrich experience in our field.There have many anvancedequipments and a first-class working team,promotes goodcorporateculture and formscomfortable workingatmosphere.

3.ln order to manage thediverse production sets outat KFX,the entire process islogged into a compaterizedsystem.From receiving theorders to shipping out theproducts every step can befollowed closely.Customerswill get satisfying productsin the requested time.


1) How soon can I receive your reply?

Our company stipulates that we must respond to customers within 12 hours, but the average response time is within 5 hours.


2) How soon can I receive your quotation?

We usually quote within 24 hours after receiving your inquiry. If you are very urgent, please call us or tell us in your email so that we can prioritize your inquiry.


3) How can I get samples to check your quality?

After the price is confirmed, you can request samples to check our quality. We will provide you with samples for free, as long as you pay the freight yourself.


4) How long do I expect to get the samples?

After you pay the sample fee (if any) and send us the confirmation drawing, the sample will be ready for delivery within 3-7 working days. The samples will be sent to you via DHL, FedEx, UPS, TNT or EMS.


5) What is the lead time for mass production?

Honestly, it depends on the order quantity. Generally, if tools are not needed, it will be 10 to 15 days after you deposit.


Hot Tags: tank cleaning full cone nozzle, manufacturers, suppliers, customized, wholesale, full cone water jet spray nozzle, anti clogging full cone spray nozzle, full cone water cleaning nozzle, cone spray nozzle for exhaust gas scrubbing, Plastic solid cone nozzle, BB plastic full cone spray nozzle

Send Inquiry

(0/10)

clearall